2016
January
February
Began redesigning the pedal/drive system after stress tests didn’t meet our ideal expectations.
Built Drumi 3.0 with a more effective drive system, which performs better than the previous one.
March
Work started on adding a new removable drum concept to allow for DIY maintenance.
April
Attended the Green Living show and Cottage Life Show to demonstrate our latest achievements.
May
Connected with off-shore manufacturers to evaluate how to bring the Drumi alive.
June
Began testing the new Drumi (4.0) prototype.
July
Developed the new Drumi 5.0 concept, which included a removable drum, a new lever type drainage system and a 2-piece pedal design for better structural alignment.
August
Evaluated the manufacturability and production plan with vendors.
September
Began working on the product refinement to meet the mass production criteria.
October
November
-december
Re-visited our vendors to re-evaluate the production capabilities.
The Drumi 5.0 included a new self-locking system that provided an enhanced user experience.